Power BI · Demo project
Industrial Production
Explore production, equipment, quality, efficiency, costs, and inventory across two fictional plants.
Demonstration
Open in Power BIContext
A packaging manufacturer needs to monitor losses and capacity across three production shifts.
Proposal
Compare actual production against targets and investigate downtime, scrap, and stockout risk.
Proposed architecture
13,248 simulated hourly records → Power Query → DAX measures → seven Power BI pages.
Practical use
Identify equipment with low availability and materials below minimum stock.